Portfolio

Pioneer Hybrid

2019-08-24T09:37:54-04:00

Pioneer Hybrid, an agribusiness, had a traveling progress show. Due to the extensive summer heat, air conditioning for the tents was an absolute necessity. In order maintain a cool temperature in the tents, the cost for Pioneer Hybrid to rent the AC (Air Conditioning) equipment exceeded $100,000 per event. VASEY designed a system...

Free Methodist Church: World Ministry Center

2019-08-24T09:44:21-04:00

Free Methodist Church/World Ministry Center has been a VASEY service and project customer since 2014. Free Methodist Church/World Ministry Center has struggled with their building for years – rising utility and maintenance costs with little to no increase in performance. Another service provider couldn’t provide any solutions...

Mays Property

2019-08-24T09:41:42-04:00

3737 North Meridian (owned by Mays Property Management Company) has been a VASEY service and project customer since 2014. With multiple types of tenants (doctors, lawyers, and dentists offices) Mays Property lacked proper temperature control over their individual offices. The fluctuations created an uncomfortable environment for the property owner’s tenants as well as for the tenants’ clientele...

Package Right

2019-08-24T09:38:51-04:00

Package Right has been a VASEY service and project customer since 2007. The customer wanted to resurrect an abandoned building for expansion that contained two large steam boilers. Antiquated and inefficient heating coils and fans were located at various locations throughout the building. With the assistance of an outside engineer and multiple VASEY team members, an analysis on the potential...

Toray Resin Company

2019-08-24T09:34:39-04:00

Toray Resin has been a VASEY service and project customer since 2011. A serious equipment failure occurred the day before Good Friday. Since Toray Resin’s chiller is on the production line, operating round-the-clock, downtime for repair or installation is never an option. Two out of the three compressors on the chiller were not functioning - a major problem since it was an essential component...

Go to Top