Case Study - Mays Property

With multiple types of tenants (doctors, lawyers, and dentists offices) Mays Property lacked proper temperature control over their individual offices. The fluctuations created an uncomfortable environment for the property owner’s tenants as well as for the tenants’ clientele.

Case Study - Free Methodist Church: World Ministry Center

Free Methodist Church/World Ministry Center has struggled with their building for years – rising utility and maintenance costs with little to no increase in performance. Another service provider couldn’t provide any solutions for their past and present issues.

Case Study - St. Thomas Aquinas Church

The customer was operating an antiquated boiler with associated equipment that performed poorly and was unable to keep up with facility demands. The bottom line was the church had a system that was highly inefficient and too costly to repair.

Case Study - Pioneer Hybrid

Pioneer Hybrid, an agribusiness, had a traveling progress show. Due to the extensive summer heat, air conditioning for the tents was an absolute necessity. In order maintain a cool temperature in the tents, the cost for Pioneer Hybrid to rent the AC equipment exceeded $100,000 per event.

Pages